Anderton Concrete, the leading supplier of cable protection products to the U.K rail industry, will be showcasing its latest advancements in lightweight and sustainable rail concrete technologies at this year’s Railtex / Infrarail exhibition on stand C78.
Between 10th – 12th May at Olympia London, Anderton Concrete’s technical experts will be providing visitors with exclusive advice on how they can increase the efficiency and sustainability of upcoming projects, without compromising on performance or quality.
Attendees will be able to view Anderton Concrete’s extensive precast concrete product range for the rail sector, including Cable Troughing, Bespoke Precast and Retaining Wall Systems. The team can also discuss Ibstock’s ESG plan up to 2030.
Also on display will be Anderton Concrete’s Eco-Troughing technology, which provides further weight reduction, alongside lower embodied carbon properties that are achieved through the removal of mass and use of alternative materials. This solution has been identified as one of the most cost-effective and sustainable on the market today.
Neil Cross, National Sales Manager at Anderton Concrete, said: “Sustainability continues to remain at the centre of industry advancements for the rail sector, and as a company at the heart of building, we are dedicated to ensuring we consistently provide construction professionals with products that set the standard for sustainability and efficiency.
“We look forward to meeting with industry professionals to discuss their upcoming projects and identify how our comprehensive portfolio of precast concrete rail products can ensure a successful specification.”
Be sure to visit stand C78 between May 10-12, to uncover how Anderton Concrete is reducing both weight and carbon to provide professionals with sustainable concrete rail products that provide ultimate levels of durability and reliability.
For further information on Anderton Concrete’s market leading rail technologies, visit: www.andertonconcrete.co.uk or call 0333 234 3434.


