HomeRail FreightGB Railfreight boosts sustainability by trialling new battery powered locomotive

GB Railfreight boosts sustainability by trialling new battery powered locomotive

Listen to this article

GB Railfreight (GBRf) has taken delivery of a Class 18 hybrid+ shunting locomotive as part of a three-month trial with Beacon Rail Leasing, marking the latest expansion of its growing fleet. 

As GBRf looks towards the future of its assets, the shunting locomotive will enable low noise and zero emissions, demonstrating a clear contribution to the challenge of meeting the UK’s net zero carbon targets.

The locomotive was delivered to Whitemoor on Tuesday 1 February, where it will undergo a series of testing to understand its capabilities and performance.

Manufactured by Clayton Equipment Ltd, the Class 18 is powered by an onboard battery that provides emissions-free operation where charging facilities are available, or through a regenerative braking system. When challenges with range or operation occur, an efficient onboard Stage V compliant engine can be utilised to increase the locomotives running time.

David Golding, Asset Director, GB Railfreight, said:

“The Class 18 hybrid+ shunting locomotive has the power to play a key role in the decarbonisation of our future fleet. Going forward, it will offer a wide range of sustainable benefits capable of significantly reducing the environmental impact of our operations.”

This image has an empty alt attribute; its file name is Class-18-hybrid-shunting-locomotive-3-1024x768.jpg

Rob Dee, Chief Commercial Officer, Beacon, said:

“We are very pleased to have delivered the first of our order of 15 Class 18 hybrid+ shunting locomotives, from Clayton Equipment, to GB Railfreight.  This is a key milestone in our delivery program and we look forward to working with GB Railfreight through their trial period. This locomotive will offer our customers a greener and sustainable option for railfreight operations in the UK against the backdrop of targets to reduce emissions,”.

Clive Hannaford, Managing Director, Clayton Equipment, said:

“We are very proud to supply GB Railfreight through Beacon Rail with the Class 18 locomotive. In the fast-changing environment with decarbonisation targets, the increased demand for lower emissions, new technology and more capacity, the Clayton Equipment Hybrid+ CBD90 will support GBRf with sustainable environmental benefits which meets their commitment to invest in new technology and provide real cost savings”. 

Photo credit: GB Railfreight

RailEngineer
RailEngineerhttps://www.railengineer.co.uk
Rail Engineer is the leading independent quality monthly magazine for engineers, project managers, directors and leading rail executive decision makers. Head to www.railsubs.com to make a free subscription to RailEngineer magazine or one of its sister publications.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.