Network Rail will complete a major signalling overhaul in Manchester over the Queen’s Platinum Jubilee Bank Holiday.
As part of a project to modernise journeys into the city, a 132-year-old signal box near Philips Park will be removed, with control of the signalling equipment moving to Manchester’s state-of-the-art rail operating centre.
As well as this upgrade, which will see 29 new signals installed, the wider project will also see Network Rail replace almost 4000 metres of track and secure over 2800 metres of train-powering electric cable, making the railway safe and reliable for years to come.
More than 450 engineers will work around the clock from Thursday 2 June, ready for the railway to reopen for passengers on Monday 6 June. People needing to travel between Manchester Victoria and Stalybridge during this time should plan ahead and check their journey with National Rail Enquiries to keep their plans on track.
This is part of the multi-billion-pound Transpennine Route Upgrade which will bring faster, more reliable services for passengers travelling between York, Leeds, and Manchester.​​
Neil Holm, Transpennine Route Upgrade Director for Network Rail, said: “This major investment will unlock more reliable journeys for rail passengers in Manchester, as well as the potential for faster trains in the future.
“I know that people will be travelling across the country to celebrate the Queen’s Platinum Jubilee, so I’m sorry if our work impacts their plans. We’ve worked with our train operating partners to plan alternative routes and bus replacements to keep disruption to a minimum.”
Image credit: Network Rail

