HomeEventsRailtex / Infrarail 2022 will take place from 10–12 May 2022

Railtex / Infrarail 2022 will take place from 10–12 May 2022

Listen to this article

Renowned as the leading one-stop-shop event for the entire railway industry in the UK, Railtex / Infrarail reflects the dynamic developments in the sector and the vision of the rail network of the future. Taking place from 10–12 May 2022 at Olympia London, the popular exhibition will once again bring the entire rail supply sector together, presenting the latest developments in sustainable and smart rail operations.

More than just an exhibition!

In 2022, as well as offering new partnership opportunities, the event will deliver a diverse programme of events and features to enhance the visitor experience, making this edition a must-attend!

With Railtex and Infrarail under one roof again, visitors can expect an impressive array of technologies and innovations on display. Exhibits cover rolling stock technology, track and infrastructure, signalling and communications, vehicle maintenance equipment, fare collection systems, rolling stock leasing, electronics for rail applications, cable technology, and many other specialised products for the efficient and safe operation of rail and public transport systems.

Railtex / Infrarail 2022 will take place from 10–12 May 2022 at Olympia London. Opening times are from 10 am to 5 pm on 10th & 11th May, and 10 am-4 pm on 12th May.

Visitors can now register in advance via the show website and benefit from FREE entry tickets.

Entry tickets are valid on all three days of the exhibition and include free access to all conferences and associated events.

Bringing together the entire railway industry to Olympia London, Railtex / Infrarail 2022 is an unmissable event and will be an excellent opportunity for rail professionals to share and showcase the latest innovations and developments in the railway field.

RailEngineer
RailEngineerhttp://therailengineer.com
Rail Engineer is the leading independent quality monthly magazine for engineers, project managers, directors and leading rail executive decision makers. Head to www.railsubs.com to make a free subscription to RailEngineer magazine or one of its sister publications.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.