new bracket

new compressor mountings
cracked part and new part

Canary Wharf becomes the penultimate Elizabeth line station transferred to TfL

Canary Wharf Elizabeth line station has been transferred to Transport for London (TfL), which means the station can be fully integrated with the operational network...