Home Rail News Innovative maintenance system automatically monitors the underside of trains for faults

Innovative maintenance system automatically monitors the underside of trains for faults

An RSSB-funded innovation that automatically monitors the underside of trains for faults is ready for testing.

Gobotix has designed the Vehicle Underframe Examination System (VUES), which is installed at the track side and uses a combination of cameras, non-visible wavelength light and computer vision algorithms to monitor for dislodged or damaged equipment and leaks.

Recalling the history of trains passing by, the self-learning equipment generates data trends and detects any anomalies.

Any faults that have been detected are then reported electronically for maintenance teams to investigate.

The system has been designed with part-funding from the RSSB’s Railway Operator Challenge Competition. The RSSB said that VUES can provide cost savings for TOCs in terms of greater life-span of components and benefits include examinations carried out daily as well as increased fleet service life.

Gobotix is currently looking to produce a low-cost demonstrator system ready for market.


Read more: Managing risk at level crossings


1 COMMENT

Leave a Reply to Hima’s COTS controllers – Rail Engineer Cancel reply

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Go-Ahead contracts TMHI to maintain its new trains in Bavaria

Go-Ahead Bavaria, which has been commissioned by the BEG and the Baden-Württemberg Ministry of Transport to operate regional train transport from December...