Durably identified cables are a blessing when the pressure mounts during critical power, machine or system downtime.
Brady has captured 10 time winners and wasters in cable & component identification. This useful document is available for free download.
Cable and component identification labels usually aren’t your prime concern, nor should they be. But have you ever lost time figuring out where which wire goes?
Ask yourself how much time or money you lose while trying to trace an unidentified cable, wire or component. Ask yourself how fast pressure builds when machinery, production lines, servers and services are impacted.
Cable and component identification labels are great tools to keep power, network, voice/data cables and components organised and running effectively. They enable you to quickly recognise which cable needs checking during troubleshooting.
When used correctly, professional cable & component identification can help you save a lot of time. Check out our 10 Time Winners in cable identification.
Fast on-site label printers
Brady offers fast label printers that need only a few seconds to print the identification label you need. Built to resist dust, moisture and the occasional bump, these reliable printers help to quickly identify any cable or component with durable identification labels, available in a wide range of label types, sizes and colours.
A wide range of labels
In your professional hands, the right tools always get the job done faster and with greater result. That is why every Brady printer has a wide variety of labels that handle every situation. Our labels are offered in the right sizes and materials for your environment and are available in easy to insert printer consumables.
Extreme durability
Cable & component labels should stick, stay attached and remain legible. Few things seem more agonising than watching the last label fall to the floor when opening an electrical cabinet during a business emergency. Brady invests heavily to continuously develop labels, inks and adhesives that really stick and remain legible, even in demanding environments.
Contact us:
BRADY U.K.
Wildmere Industrial Estate
Banbury, Oxon OX16 3JU
Tel: +44 (0) 1295 228 288
Fax: +44 (0) 1295 228 219

