Home Company News South East London lines to close for 9 days over the summer

South East London lines to close for 9 days over the summer

Network Rail is giving passengers advance warning that the railway through Hither Green, in South East London, will be closed for nine days from Saturday 25 July to Sunday 2 August as it completes signalling upgrades through the area.

The current 1970s signalling system, which controls the movement of trains on the Bromley North, Sidcup branches and main line through Hither Green, is being completely replaced with a modern, more reliable system.

The work taking place over the nine days is the commissioning of the new signalling equipment and the transfer of control from London Bridge Area Signalling Centre to Three Bridges Rail Operating Centre. It will mark the end for the old signalling location, which has been in continuous use since 1975.

The work is a key part of Network Rail’s £250 million investment to improve signalling and track reliability through the busy Lewisham area of South East London.

Fiona Taylor, Network Rail route director for Kent, said: “This work is so important for delivering a reliable railway for the many passengers who travel through this area. The signalling system is very old and in urgent need of upgrade.

“We wanted to get this work done over Easter but, because technicians can’t work closely together for long periods, it is going to take double the amount of time it would normally take to finish the job.

“We have taken the decision to complete the work in the summer holidays because we wanted to give those passengers who are still travelling, many of them critical workers, enough time to plan ahead. We also need time to put alternative travel options in place, such as an enhanced bus replacement service.”

Buses will replace trains on affected routes for the nine days, with services resuming on Monday, 3 August. Extra buses will be laid on to make sure social distancing can be achieved on the replacement services. Tickets will be accepted on alternative routes and Transport for London services, which will also be increased to ensure passengers travelling can maintain a two-metre distance.

Nigel Wordsworth BSc(Hons) MCIJhttp://therailengineer.com

SPECIALIST AREAS Rolling stock, mechanical equipment, project reports, executive interviews


Nigel Wordsworth graduated with an honours degree in Mechanical Engineering from Nottingham University, after which he joined the American aerospace and industrial fastener group SPS Technologies. After a short time at the research laboratories in Pennsylvania, USA, Nigel became responsible for applications engineering to industry in the UK and Western Europe. At this time he advised on various engineering projects, from Formula 1 to machine tools, including a particularly problematic area of bogie design for the HST.

A move to the power generation and offshore oil supply sector followed as Nigel became director of Entwistle-Sandiacre, a subsidiary of the Australian-owned group Aurora plc. At the same time, Nigel spent ten years as a Technical Commissioner with the RAC Motor Sports Association, responsible for drafting and enforcing technical regulations for national and international motor racing series.

Joining Rail Engineer in 2008, Nigel’s first assignment was a report on new three-dimensional mobile mapping and surveying equipment, swiftly followed by a look at vegetation control machinery. He continues to write on a variety of topics for most issues.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

AVENTICS launches new pneumatic air dryer with eight-year maintenance interval

AVENTICS™, one of the world’s leading product brands for pneumatic components and systems, has now launched its new range of RDD Air...