Home Rail News Birmingham New Street opens NHS clinic

Birmingham New Street opens NHS clinic

Network Rail is providing a former retail space at Birmingham New Street station for the NHS to use as an outpatient clinic for patients to have routine blood tests away from hospital.
An empty show will be used by medics for the next six months to alleviate pressure on Midlands hospitals as they deal with the coronavirus pandemic. The temporary phlebotomy clinic will be staffed by the University Hospitals Birmingham trust and tests will be carried out by appointment only.

Moving some outpatient services like routine blood tests out of hospitals will protect healthy people from encountering patients sick with coronavirus.

Patrick Power, Birmingham New Street station manager, said: “We’re doing everything we can to support the NHS in this unprecedented time so offering up this empty retail unit was a real no brainer.

“The clinic being based in the Midlands’ largest transport hub means it will be extremely easy for people to travel to, should a routine blood test be advised by their doctor. With some train services being reduced however I’d advise people to check www.nationalrail.co.uk daily to check the time of their train.

“I’d also like to reassure passengers that we are following all of Public Health England’s guidelines to keep people safe and continue to regularly deep clean the station to stop the spread of coronavirus.”

Dr David Rosser, CEO, University Hospitals Birmingham NHS Foundation Trust, said: “The Trust has made some important decisions which will reduce the number of people attending our hospitals and community services in person.

“The aim is to limit footfall across our sites to ensure only the most acutely unwell inpatients, people who require emergency interventions and those with essential appointments are on site, enabling those who do not need to attend to avoid unnecessary travel and exposure to a large healthcare setting.

“The new off-site clinic is one of the measures that will help ensure we can best meet the needs of our patients during a sustained period of pressure.”

For the latest NHS advice on coronavirus, visit www.nhs.uk/coronavirus-covid-19/

Nigel Wordsworth BSc(Hons) MCIJhttp://therailengineer.com

SPECIALIST AREAS Rolling stock, mechanical equipment, project reports, executive interviews


Nigel Wordsworth graduated with an honours degree in Mechanical Engineering from Nottingham University, after which he joined the American aerospace and industrial fastener group SPS Technologies. After a short time at the research laboratories in Pennsylvania, USA, Nigel became responsible for applications engineering to industry in the UK and Western Europe. At this time he advised on various engineering projects, from Formula 1 to machine tools, including a particularly problematic area of bogie design for the HST.

A move to the power generation and offshore oil supply sector followed as Nigel became director of Entwistle-Sandiacre, a subsidiary of the Australian-owned group Aurora plc. At the same time, Nigel spent ten years as a Technical Commissioner with the RAC Motor Sports Association, responsible for drafting and enforcing technical regulations for national and international motor racing series.

Joining Rail Engineer in 2008, Nigel’s first assignment was a report on new three-dimensional mobile mapping and surveying equipment, swiftly followed by a look at vegetation control machinery. He continues to write on a variety of topics for most issues.

A truth half told

Channel 4’s recent documentary “Britain’s train hell” asked why trains are in such a mess and what can be done to fix...