Home International Bangkok Skytrain extension opens using Bombardier wayside rail system

Bangkok Skytrain extension opens using Bombardier wayside rail system

The latest extension to Bangkok’s rapid transit Skytrain, the 13km Bearing-Samut Prakam section of the Sukhumvit line, opened recently using a turnkey wayside rail system supplied by a consortium led by Bombardier Transportation.

Bombardier itself was responsible for system integration, delivery of its Cityflo 450 rail control solution and the main power supply works. Partner ST Electronics (Thailand) provided the telecommunications, automatic fare collection and platform screen door systems while AMR Asia Company provided the depot workshop facilities, supervisory control and data acquisition, building management, back-up power supply and fire-fighting systems as well as installation.

The new line opened on 6 December and is expected to carry up to 100,000 more journeys on the Skytrain, which now regularly carries over 750,000 passengers per day. It was inaugurated by Thailand’s Prime Minister, Prayut Chan-o-cha, at a special event attended by many senior officials and dignitaries.

Gregory Enjalbert, Bombardier’s managing director in Thailand, commented: “It is exciting to witness the opening of a new rail link that is extending connectivity to new parts of the Thai capital and will significantly improve the travel experience for commuters. As a long-term partner to Bangkok Mass Transit System Public Company Limited (BTSC), we continue to positively impact the life of Bangkokians and are proud that our project was delivered by our large local team in Bangkok.”

Nigel Wordsworth BSc(Hons) MCIJhttp://therailengineer.com

SPECIALIST AREAS Rolling stock, mechanical equipment, project reports, executive interviews


Nigel Wordsworth graduated with an honours degree in Mechanical Engineering from Nottingham University, after which he joined the American aerospace and industrial fastener group SPS Technologies. After a short time at the research laboratories in Pennsylvania, USA, Nigel became responsible for applications engineering to industry in the UK and Western Europe. At this time he advised on various engineering projects, from Formula 1 to machine tools, including a particularly problematic area of bogie design for the HST.

A move to the power generation and offshore oil supply sector followed as Nigel became director of Entwistle-Sandiacre, a subsidiary of the Australian-owned group Aurora plc. At the same time, Nigel spent ten years as a Technical Commissioner with the RAC Motor Sports Association, responsible for drafting and enforcing technical regulations for national and international motor racing series.

Joining Rail Engineer in 2008, Nigel’s first assignment was a report on new three-dimensional mobile mapping and surveying equipment, swiftly followed by a look at vegetation control machinery. He continues to write on a variety of topics for most issues.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Electric services from London reach Cardiff as Severn tunnel electrification is...

Passenger trains are finally running from London Paddington to Cardiff using electric traction the whole way, following the electrification of the Severn...