Home Rail News Registration opens for IMechE Railway Challenge

Registration opens for IMechE Railway Challenge

Teams of students, industry apprentices and young professionals from the UK and abroad have been invited to take part in the IMechE’s Railway Challenge for 2019.

Every year the competition, which was launched in 2012, requires participants to design and manufacture a miniature 10 1/4” gauge locomotive in accordance with a number of precise rules.

During the competition weekend in the summer of 2019, locomotives will be tested at the Stapleford Miniature Railway, Leicestershire, in a series of track-based and presentation challenges.

This includes a design report and business presentation, as well as track-based challenges on the locomotive’s traction, ride comfort, noise, maintainability and ability to store energy.

For 2019, a new track-based challenge will be introduced: the auto–stop function, where participating teams will have to design their train to stop as close as possible to a marked point on the track. Teams will also be required to design a technical poster to encourage participants to communicate effectively how the principal systems of their locomotive work.

Last year saw 10 teams from the likes of Aachen University, Germany, Birmingham University and Transport for London enter. First time entrant Ricardo was crowned the overall winner.

As part of the IMechE’s commitment to inspire the next generation of engineers, the Railway Challenge will host a STEM Day at the competition. Local schools will be invited to take part in STEM activities run by a dedicated group of ambassadors.

For more information, please visit: www.imeche.org/events/challenges/railway-challenge


Read more: Ricardo wins 2018 Railway Challenge


 

RailEngineerhttp://therailengineer.com
Rail Engineer is the leading independent quality monthly magazine for engineers, project managers, directors and leading rail executive decision makers. Head to www.railsubs.com to make a free subscription to RailEngineer magazine or one of its sister publications.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Electric services from London reach Cardiff as Severn tunnel electrification is...

Passenger trains are finally running from London Paddington to Cardiff using electric traction the whole way, following the electrification of the Severn...