Home Rail News Innovative maintenance system automatically monitors the underside of trains for faults

Innovative maintenance system automatically monitors the underside of trains for faults

An RSSB-funded innovation that automatically monitors the underside of trains for faults is ready for testing.

Gobotix has designed the Vehicle Underframe Examination System (VUES), which is installed at the track side and uses a combination of cameras, non-visible wavelength light and computer vision algorithms to monitor for dislodged or damaged equipment and leaks.

Recalling the history of trains passing by, the self-learning equipment generates data trends and detects any anomalies.

Any faults that have been detected are then reported electronically for maintenance teams to investigate.

The system has been designed with part-funding from the RSSB’s Railway Operator Challenge Competition. The RSSB said that VUES can provide cost savings for TOCs in terms of greater life-span of components and benefits include examinations carried out daily as well as increased fleet service life.

Gobotix is currently looking to produce a low-cost demonstrator system ready for market.


Read more: Managing risk at level crossings


1 COMMENT

Leave a Reply to Hima’s COTS controllers – Rail Engineer Cancel reply

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Must Read

RIA launches RAIL 2050 Manifesto for the rail industry

As the UK heads towards a general election, the Railway Industry Association (RIA) has launched its RAIL 2050 Manifesto, setting out the...

Cornwall’s Capacity Triumph

Back in January 2018 (issue 159), Rail Engineer reported on a plan to increase the capacity of rail operations in Cornwall by...

Dawlish Sea Wall – the start of a 100-year plan

Over the last few years, Rail Engineer has written a number of articles about the Dawlish sea wall. There have been many pictures...

If it’s Tuesday it must be Olomouc

It is easy to sympathise with teachers who take groups of schoolchildren on educational visits, as they work hard to keep their...