Home SPONSORED FEATURE Assessing risk in depots - EMC in the rail environment

Assessing risk in depots – EMC in the rail environment

EMC (Electromagnetic Compatibility) is an important part of any rail project, be it recommissioning or refurbishing rolling stock, or managing the updates or new builds of depots and stabling facilities.

EMC management, from a risk-based point of view, is something that needs to be carried through all of the stages of a project, ideally from conception to completion. This is the job of the EMC risk assessment.

Making an early start

It is advantageous to the project, and the EMC engineers, for the risk assessment process to start as soon as possible. The risk register results are then updated throughout the life of the project. It is possible to create the risk register at the feasibility or option selection stages, and certainly once the outline of the project is known. This avoids the issues encountered by mitigating risks on already installed or purchased equipment during the commissioning phase.

The difficulty arises when keeping the EMC process up to date throughout the life of the project, as contractors and subcontractors generally change at the different stages. Ideally, the risk register is populated before designs are finalised, then subsequent activities reduce the hazards identified in the risk register to ALARP (as low as reasonably practicable) by the end of the project.

SANYO DIGITAL CAMERA
SANYO DIGITAL CAMERA

 

One of the actions possible to reduce risks is on-site measurement, both before and after energisation. The reasons for performing measurements prior to any works include benchmarking the existing emissions so that a comparison may be made with the new installation(s), identifying any particular EM threats at the location for inclusion in the hazard analysis and the design review, and gathering evidence in case future claims are made by neighbours or users regarding interference to radio communications services or other equipment.

Self-interference

Induction from traction current and other HV feeder systems can be modelled and, if an issue is identified, designed out of most railway installations. This is often an important step in reducing the hazards in the risk register, and is of obvious benefit to carry out at a design stage before cabling is installed.

In terms of compatibility, it is of course of vital importance that the signalling systems are not interfered with by both external effects or by the railway itself. In order to ensure that this is unlikely, the risk assessment will highlight any situation that may result in a malfunction of equipment or apparatus. This will then be closed out by subsequent activities, such as procurement reviews or compliance matrices, or by signalling compatibility studies or testing if required.

A final hazard analysis is normally carried out to provide an end-of-project risk register in which all hazards will have either been closed or set to ALARP.

Article written by Dr Rob Armstrong, Consultancy Manager at York EMC Services.

Previous articleIntelligent design
Next articleTwo days at Rail 2015

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Must Read

Dawlish to get new sea wall

Government funding of £80 million has been announced to provide a new sea wall at Dawlish that will improve protection both for the railway...

Unusual bridge strike closes one track of West Coast main line

An unusual bridge strike closed one track on the West Coast main line and caused a speed restriction to be imposed across...

Stuart Calvert to be new Digital Railway head

Stuart Calvert, director of programme technical services and supply chain at Network Rail’s Group Digital Railway (GDR), has been announced as its new managing...

Major organisation changes at Network Rail

Network Rail has announced sweeping changes to its organisation following the completion of new chief executive Andrew Haines’ ‘100 Day Review’.

Danny Di Perna replaces Laurent Troger to head Bombardier Transportation

It’s all change at the top as Laurent Troger resigns as president of Bombardier Transportation to “pursue opportunities outside the company”. Danny...