Home SPONSORED FEATURE Time to tool up!

Time to tool up!

Railway depots are busy places. Trains arrive through the night, and there is very limited time before they have to be back out on the network again ready for the morning peak period. So the last thing engineers working to tight schedules need is to lose valuable time while searching for a specific tool or tool set. Lost time not only costs money but can add stress to any piece of work.

That is why there is a sound business case for equipping railway maintenance and repair depots with heavy duty, multi-drawer tool storage trolleys designed to take the knocks of daily use.

In many business sectors, including the global aerospace industry, engineering managers and their teams depend on Bahco tool storage trolleys and chests, knowing every tool can be found when it’s needed.

No irritating sorting through toolboxes or bags. No wondering: “Where on earth did I put that torque wrench or insulated screwdriver?”

A Bahco tool cabinet ideal for use by rail maintenance and repair engineers [online]

Fitted drawers in seven colours

Foam inlays within each drawer bring order and organisation to the workplace. Bahco manufactures more than 50 different modules, each one a perfect fit in the trolley. The product range reflects the company’s relentless pursuit of perfection.

Buyers can choose heavy-duty trolleys from two sizes, seven colours and with six, seven, eight or twelve drawers.

When trolleys need moving, Bahco’s ‘lock and go’ system automatically secures the drawers when they are closed, while braked swivel wheels provide stability.

Fully opening drawers, with a load capacity of 45kg per drawer, move quickly and easily on ball bearing slides. Double walled frames enable drawers and slides to work perfectly, even if the frame gets damaged.

So to find the next tool that’s needed, just open the drawer and there it will be.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Must Read

Dawlish to get new sea wall

Government funding of £80 million has been announced to provide a new sea wall at Dawlish that will improve protection both for the railway...

Unusual bridge strike closes one track of West Coast main line

An unusual bridge strike closed one track on the West Coast main line and caused a speed restriction to be imposed across...

Stuart Calvert to be new Digital Railway head

Stuart Calvert, director of programme technical services and supply chain at Network Rail’s Group Digital Railway (GDR), has been announced as its new managing...

Major organisation changes at Network Rail

Network Rail has announced sweeping changes to its organisation following the completion of new chief executive Andrew Haines’ ‘100 Day Review’.

Danny Di Perna replaces Laurent Troger to head Bombardier Transportation

It’s all change at the top as Laurent Troger resigns as president of Bombardier Transportation to “pursue opportunities outside the company”. Danny...