Home Business Tracking Up at Infrarail

Tracking Up at Infrarail

ArcGen Hilta will be exhibiting, and providing information on, a range of products ideal for the rail industry, including its Network Rail approved SMC TL-90 lighting tower and ArcGen Hilta Weldmaker 165SP2.

It will also be showcasing the very best of its lighting portfolio, with the Lumaphore and LED ranges.

As one of the UK’s premier providers of onsite power equipment, ArcGen Hilta’s products are ideal for use on rail projects, and many have already established themselves as industry favourites.

The Network Rail approved SMC TL-90 lighting tower is one of ArcGen Hilta’s most popular products.

Crucial safety features include an emergency stop that disconnects all electrical circuits and a mast deployment alarm and a safety system which ensures the mast descends automatically when the handbrake is released, preventing collisions with electrified overhead rail cables.

ArcGen Hilta has also recently developed the SMC TL-90 to create the SMC TL-90 LED, with 4 x 180W LED light assemblies providing 720W of lighting power and up to seven times the operating life of a metal halide bulb.

ArcGen Hilta will also be exhibiting its Weldmaker 165SP2, a super-silent welder generator designed for use in a wide variety of applications. The Weldmaker 165SP2 was Network Rail approved in 2009 after demonstrating cost savings in the repair of damaged rails when working in conjunction with ESAB’s automated repair welding unit.

ArcGen Hilta’s most innovating portable temporary lighting solution, Lumaphore, will also be making an appearance at the show. The Lumaphore lighting range is made up of lightweight portable lighting products, weighing from only 8.5kg, making them the ideal lighting solution for rail projects, where space is often limited.

Visit ArcGen Hilta on stand H20.

 

 

4 COMMENTS

  1. Travesti chatroulette chat roulette Türkiye’nin ilk Travestiler’e yönelik online chat roulette sohbet ve chat sitemiz çok yakinda.Travesti Best Model üyeleri sohbet odalari chat kanallar’inda diger ü…http://www.travestibestmodel.net/

Leave a Reply to Travesti Cancel reply

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Must Read

New train protection system for Irish Rail

Above - CPC commercial manager John Mogridge and Egis systems integration lead François Pignard looking at the in-cab display for the...

Geophysical consultancy Zetica expands with help from HSBC UK

Zetica, the engineering and environmental geophysics consultancy, has renovated a 21,500 sq.ft. building to accommodate up to 80 staff, as well as provide additional...

Birmingham: Washwood Heath train factory demolished

The former Alstom factory at Washwood Heath, Birmingham, where Virgin’s Pendolinos were built, has been demolished to make way for an HS2 maintenance depot.

Barnehurst cutting reopened after landslip closes the Bexleyheath line for a week

The cutting at Barnehurst, on the Bexleyheath line between Lewisham and Dartford, Kent, reopened on Monday 18 February after being closed for a week.

West Coast main line reopens after lorry strikes bridge

Network Rail has reopened the West Coast main line through the Stafford area after more than 24 hours of disruption caused by a...