Home High Speed Rail Deutsche Bahn seeks ICE approval

Deutsche Bahn seeks ICE approval

Deutsche Bahn has submitted an application for fundamental approval of its ICE trains for the Channel Tunnel to the responsible safety authority, the Intergovernmental Commission (IGC).

“We have provided all the evidence necessary for the fundamental approval of our ICE trains in the Channel Tunnel. This means that we are now much closer to meeting all the requirements for a direct ICE service between London and cities such as Cologne, Frankfurt and Amsterdam,” says Ulrich Homburg, the DB Management Board member responsible for Passenger Transport.

An independent Swiss engineering office prepared a comprehensive safety study for the submission on behalf of DB. This provided evidence of the safety compliant features of the 200-metre long ICE trainsets in both single and double traction mode. In addition, extensive evacuation simulations were performed by a second group of experts, and DB also successfully completed an evacuation test inside the Channel Tunnel with two coupled ICE trains in October 2010.

DB hopes to start passenger services in 2013.

Avatar
Previous articleEurocodes Decoded
Next articleRoyal Rebuild

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Must Read

“Radical yet respectful” proposals for Birmingham Moor Street station revealed

Proposals for a “radical yet respectful” transformation to Birmingham Moor Street station have been released. The existing station building, which...

Greater Anglia train drivers taking leap into new technology

New state-of-the-art train simulators are being used to train 768 Greater Anglia drivers that will be driving the new trains due to replace all...

Edinburgh Tram extension to Newhaven gets Council approval.

The proposed extension of the Edinburgh Tram network, as previously reported in Rail Engineer, has now been approved by Edinburgh City Council....

New plans for rail freight in Scotland

The freight industry in Scotland has collectively launched a new strategy intended to increase the amount of freight moved by rail. This is in...

Rail Engineer March 2019: Digital Railway, Signalling & Telecoms

https://issuu.com/railmedia/docs/tre-march-2019